There is now a CONTENT FREEZE for Mercury while we switch to a new platform. It began on Friday, March 10 at 6pm and will end on Wednesday, March 15 at noon. No new content can be created during this time, but all material in the system as of the beginning of the freeze will be migrated to the new platform, including users and groups. Functionally the new site is identical to the old one. webteam@gatech.edu
*********************************

Contact

Jennifer Disotell

 Special Projects Manager

Infrastructure & Sustainability / Design & Construction

470-378-6894

151 6th Street NW, Atlanta, GA 30332-0351

 

 

Sidebar Content

This is Phase I of a project to replace roofing at the Holland Plant.  Subsequent phases will follow during the first quarter of 2022.

Summaries

Summary Sentence:

There will be a closure of Plant Drive between the Plant and Daniel & Lyman Hall on Monday, December 20th from 7 a.m. to 5 p.m.

Full Summary:

There will be a closure of Plant Drive between the Plant and Daniel & Lyman Hall on Monday, December 20th from 7 a.m. to 5 p.m..  Be advised traffic will be re-routed to the Plant, Lyman and Daniel Hall parking areas via the 2nd entrance to Plant Drive.

Media
  • Holland Plant Roofing Project Logistics Dec. 2021 Holland Plant Roofing Project Logistics Dec. 2021
    (image/jpeg)

There will be a closure of Plant Drive between the Plant and Daniel & Lyman Hall on Monday, December 20th from 7 a.m. to 5 p.m..  Be advised traffic will be re-routed to the Plant, Lyman and Daniel Hall parking areas via the 2nd entrance to Plant Drive.  Proceed with caution as this is against the normal flow of traffic around the building (although wide enough to accommodate incoming/outgoing vehicles).  A spotter will be posted at the corner rounding North to the section of Plant Drive to the parking lots to slow vehicles down and warn of oncoming traffic. An additional spotter will be placed on Bobby Dodd to direct vehicles to the 2nd entrance to Plant Drive.

Normal access to Plant Drive will resume on December 21st.  A similar shutdown for the crane to demobilize will occur as soon as December 24th or as late as Monday, December 27th. 

This is Phase I of a project to replace roofing at the Holland Plant.  Subsequent phases will follow during the first quarter of 2022.


 

Additional Information

Groups

Facilities Management

Categories
Institute and Campus
Related Core Research Areas
No core research areas were selected.
Newsroom Topics
No newsroom topics were selected.
Keywords
Facilities-Notices, Holland Plant, reroofing project