Boiler Transfer from A. French Building to Bradley Building 9/9 and 9/10

*********************************
There is now a CONTENT FREEZE for Mercury while we switch to a new platform. It began on Friday, March 10 at 6pm and will end on Wednesday, March 15 at noon. No new content can be created during this time, but all material in the system as of the beginning of the freeze will be migrated to the new platform, including users and groups. Functionally the new site is identical to the old one. webteam@gatech.edu
*********************************

Contact

Jennifer Disotell

 Special Projects Manager/ 470-378-6894

jennifer.disotell@facilities.gatech.edu

Sidebar Content

Movement of boiler from A. French building to Bradley Building will impact pathways on 9/9 and 9/10.

Summaries

Summary Sentence:

Two large boilers will be moved from the A. French Building to the Bradley Building.

Full Summary:

Two large boilers will be moved from the A. French Building to the Bradley Building on Thursday and Friday 9/9 and 9/10.

Media
  • Boiler Move from French to Bradley Boiler Move from French to Bradley
    (image/png)

A large equipment moving operation will take place in the vicinity of A. French and Bradley/Administration Building on the Hill 09/09 and 09/10 (7 a.m. to 10 a.m.).  The operation will involve the movement of two (2) large boilers from the loading dock at A. French to the basement of Bradley Building with the use of a forklift.  Pedestrians are requested to STAY ALERT AND FOLLOW ALL SAFETY COMMANDS BY THE CONTRACTOR while navigating through the work zone from 7 a.m. to 10 a.m. on 09/09 and 09/10.

The schedule is as follows for each day:

  1. 7:00A-7:20A Unload boiler from delivery truck with forklift.
  2. 7:15A-7:30A  Deliver forklift to Bradley Building basement stairs.
  3. 7:30A-8:00A Rigging of boiler to set boiler below steps.
  4. 8:00A-9:30A De-crate boiler, remove and haul-off crate debris, and remove boiler skin. Start handling/moving boiler inside Bradley basement.
  5. 10:00A Boiler is inside Bradley basement and forklift is staged on A. French loading dock for Friday 09/10 phase 2 boiler handling work day.

Please note that brief intermittent closure of Uncle Heinie Way may be necessary during the transport of the equipment from the loading dock. Be prepared to use alternate walking paths in the immediate area or wait for the path to re-open if such a closure is required.  The Contractor will provide spotters in front of and behind forklift while in motion to watch for pedestrians.  The green arrows in the map indicate the path of travel for forklift/equipment.

Additional Information

Groups

Facilities Management

Categories
Institute and Campus
Related Core Research Areas
No core research areas were selected.
Newsroom Topics
No newsroom topics were selected.
Keywords
Facilities-Notices, Campus Construction, boilers, A. French Building, Bradley Building