The Optimal Control Limit of a G-EWMAG Control Chart

*********************************
There is now a CONTENT FREEZE for Mercury while we switch to a new platform. It began on Friday, March 10 at 6pm and will end on Wednesday, March 15 at noon. No new content can be created during this time, but all material in the system as of the beginning of the freeze will be migrated to the new platform, including users and groups. Functionally the new site is identical to the old one. webteam@gatech.edu
*********************************

Event Details
  • Date/Time:
    • Friday January 21, 2011 - Saturday January 22, 2011
      10:00 am - 10:59 am
  • Location: ISyE Executive classroom
  • Phone:
  • URL:
  • Email:
  • Fee(s):
    N/A
  • Extras:
Contact
No contact information submitted.
Summaries

Summary Sentence: The Optimal Control Limit of a G-EWMAG Control Chart

Full Summary: No summary paragraph submitted.

TITLE:  The Optimal Control Limit of a G-EWMAG Control Chart

SPEAKER:  Chang Kang

ABSTRACT:

The control chart is a widely used statistical process control (SPC) tool that detects any process change and plays an important role in high-quality processes. In this paper, we design G-EWMAG control chart which is sensitive to both small and large shifts. G-EWMAG control chart combines G control chart with EWMAG control chart. The G control chart is based on a plot of the G statistic designed for quality control using attribute data. There is a drawback in G control chart. When it is applied to high-quality processes, it performs poorly in detecting small shifts. On the other hand, EWAMG control chart which apply the EWMA technique with attribute data to G statistics can quickly detect small shifts. G-EWMAG control chart have the ratio which represent the combination ratio of G control chart and G-EWMAG control chart. A large ratio makes the G-EWMAG control chart sensitive to detecting large shifts. On the other hand, a small ratio makes it sensitive to detecting small shifts. But problems arise when the G-EWMAG control chart has an ratio of 1. In this case, a slight numerical difference in average run length (ARL1) between EWMAG and G-EWMAG appears to exist when detecting small shifts. We suggest optimal control limits for designing the G-EWMAG control chart which is sensitive both large and small shift for use in high-quality processes.

Joint work with Jae-Won Baik, Hae-Woon Kang and Min Song.

Additional Information

In Campus Calendar
No
Groups

School of Industrial and Systems Engineering (ISYE)

Invited Audience
No audiences were selected.
Categories
No categories were selected.
Keywords
No keywords were submitted.
Status
  • Created By: Anita Race
  • Workflow Status: Published
  • Created On: Jan 18, 2011 - 5:45am
  • Last Updated: Oct 7, 2016 - 9:53pm