Crane Staging on Sixth Street May 18 - 22

*********************************
There is now a CONTENT FREEZE for Mercury while we switch to a new platform. It began on Friday, March 10 at 6pm and will end on Wednesday, March 15 at noon. No new content can be created during this time, but all material in the system as of the beginning of the freeze will be migrated to the new platform, including users and groups. Functionally the new site is identical to the old one. webteam@gatech.edu
*********************************

Installation of speaker system

Contact

Spencer Sheffield

Project Manager, Senior

spencer.sheffield@aux.gatech.edu

Sidebar Content

Crane Staging on Sixth Street May 18 - 22.

Summaries

Summary Sentence:

Crane Staging on Sixth Street, south sidewalk closed temporarily.

Full Summary:

Installation of a speaker system on the Roe Stamps Field video board requires a crane and will partially block Sixth Street and the south sidewalk.

Media
  • Sixth Street crane staging May 18-22 Sixth Street crane staging May 18-22
    (image/png)

 Sixth Street will be partialy blocked beginning May 18, 2020 through May 22, 2020. 

A speaker system will be installed on the Roe Stamps Field video board located on the south side of Sixth Street just west of Ferst Drive.  The south sidewalk will be closed as well.  This closure is weather dependent.

The boom truck will be placed along the south sidewalk allowing traffic to pass on the north side of the street.  See attached plan.

Spencer Sheffield

Project Manager, Senior

 

Additional Information

Groups

Facilities Management

Categories
Institute and Campus
Related Core Research Areas
No core research areas were selected.
Newsroom Topics
No newsroom topics were selected.
Keywords
Facilities-Notices, Campus Construction
Status
  • Created By: cbrim3
  • Workflow Status: Published
  • Created On: May 14, 2020 - 1:34pm
  • Last Updated: May 14, 2020 - 1:39pm