BME Whitaker Building/Ferst Drive Sidewalk and Lane Closures

*********************************
There is now a CONTENT FREEZE for Mercury while we switch to a new platform. It began on Friday, March 10 at 6pm and will end on Wednesday, March 15 at noon. No new content can be created during this time, but all material in the system as of the beginning of the freeze will be migrated to the new platform, including users and groups. Functionally the new site is identical to the old one. webteam@gatech.edu
*********************************

Contact

Jessica Rose: Facilities Communications & Analytics

Jennifer Disotell: Construction Project Manager 

 

Sidebar Content
No sidebar content submitted.
Summaries

Summary Sentence:

There will be a sidewalk closure and periodic lane closures along Ferst Drive from 8a.m through 5p.m. until Friday, February 22. 

Full Summary:

No summary paragraph submitted.

To enable the replacement of electrical switches located in an underground vault on the southern side of the BME Whitaker Building, there will be a sidewalk closure and periodic lane closures along Ferst Drive from 8 a.m through 5 p.m. until Friday, February 22. 

A sidewalk closure from the entrance of BME Whitaker to the crosswalk accessing the drive between Cherry Emerson and Klaus is required between 8 a.m. to 5 p.m. daily from Monday, February 11 to Friday, February 22. The fencing and sidewalk closure signs will be removed at the end of each shift so normal pedestrian access can be restored during evening hours. 

In addition to the sidewalk closure, the east bound lane of traffic will be periodically closed. With these lane closures, the contractor will provide flagmen to keep traffic moving safely along Ferst Drive. These lane closures will be scheduled for early morning hours as much as possible to minimize disruptions.

Additional Information

Groups

Facilities Management

Categories
No categories were selected.
Related Core Research Areas
No core research areas were selected.
Newsroom Topics
No newsroom topics were selected.
Keywords
construction-updates, bicycle friendly university
Status
  • Created By: Jessica Rose
  • Workflow Status: Published
  • Created On: Feb 12, 2019 - 2:40pm