*********************************
There is now a CONTENT FREEZE for Mercury while we switch to a new platform. It began on Friday, March 10 at 6pm and will end on Wednesday, March 15 at noon. No new content can be created during this time, but all material in the system as of the beginning of the freeze will be migrated to the new platform, including users and groups. Functionally the new site is identical to the old one. webteam@gatech.edu
*********************************
Atlanta, GA | Posted: December 6, 2018
Scheduled Service Maintenance for Banner Production
WHAT IS HAPPENING?
All of Banner Production (i.e.: INB, Banner 9 Administrative Pages, SSB, Job Submission) and ancillary systems (Global ECS interface to Banner, TouchNet, GradesFirst, Canvas, TSquare, Grade Adapter, etc.) will be unavailable on Thursday (Dec. 6th) from 7:00 PM to approximately 11:00 PM so that operating system patches may be installed on the database server
WHEN IS IT HAPPENING?
The maintenance will occur between 7:00 PM and approximately 11:00 PM on Thursday, Dec. 6th.
WHO IS AFFECTED BY THIS INTERRUPTION?
All of Banner and ancillary systems that interface to Banner production are affected by this downtime.
WHAT DO YOU NEED TO DO?
Nothing. EIS will restart all applications, interfaces and services upon conclusion of the maintenance.
WHAT IF YOU HAVE QUESTIONS?
If you have any questions feel free to call Dan Looby (4-9587) or send me an e-mail (daniel.looby@oit.gatech.edu)