ISyE Seminar

*********************************
There is now a CONTENT FREEZE for Mercury while we switch to a new platform. It began on Friday, March 10 at 6pm and will end on Wednesday, March 15 at noon. No new content can be created during this time, but all material in the system as of the beginning of the freeze will be migrated to the new platform, including users and groups. Functionally the new site is identical to the old one. webteam@gatech.edu
*********************************

Event Details
  • Date/Time:
    • Thursday October 2, 2014 - Friday October 3, 2014
      11:00 am - 11:59 am
  • Location: Executive Conference Room 228 Main
  • Phone:
  • URL:
  • Email:
  • Fee(s):
    N/A
  • Extras:
Contact
No contact information submitted.
Summaries

Summary Sentence: ISyE Seminar

Full Summary: No summary paragraph submitted.

TITLE:  Analysis of Tailored Base-Surge Policies in Dual Sourcing Inventory Systems

SPEAKER: Ganesh Janakiraman

ABSTRACT:

We study a model of a firm managing its inventory of a single product by sourcing supplies from two supply sources, a regular supplier who offers a lower unit cost and a longer lead time than a second, emergency, supplier. A practically implementable policy for such a firm is a Tailored Base-Surge (TBS) Policy (Allon and Van Mieghem, 2010) to manage its inventory: Under this policy, the firm procures a constant quantity from the regular supplier in every period and dynamically makes procurement decisions for the emergency supplier. Allon and Van Mieghem describe this practice as using the regular supplier to meet a base level of demand and the emergency supplier to manage demand surges, and they conjecture that this practice is most effective when the lead time difference between the two suppliers is large. We confirm these statements in two ways. First, we show the following analytical result: When demand is composed of a base demand random component plus a surge demand random component, which occurs with a certain small probability, the best TBS Policy is close to optimal (over all policies) in a well defined sense. Second, we also numerically investigate the cost-effectiveness of the best TBS policy on a test bed of problem instances. The emphasis of this investigation is the study of the effect of the lead time difference between the two suppliers. Our study reveals that the cost difference between the best TBS policy and the optimal policy decreases dramatically as the lead time of the regular supplier increases. On our test bed, this cost difference decreases from an average (over the test bed) of 21 % when the lead time from the regular supplier is two periods (the emergency supplier offers instant delivery) to 3.5 % when that lead time is seven periods.

Additional Information

In Campus Calendar
No
Groups

School of Industrial and Systems Engineering (ISYE)

Invited Audience
Undergraduate students, Faculty/Staff, Graduate students
Categories
Seminar/Lecture/Colloquium
Keywords
No keywords were submitted.
Status
  • Created By: Anita Race
  • Workflow Status: Published
  • Created On: Sep 25, 2014 - 5:09am
  • Last Updated: Apr 13, 2017 - 5:21pm